Office: 01726 883 388 (Mon-Fri 8am - 4.30pm) | Mobile: 07979 934 678 (Call anytime)
Restoration, Conservation, Cob & Lime Specialists

Painting & Decorating

At A1 Complete Builders, our Painting & Decorating service delivers high-quality finishes that bring your property to life—inside and out. We focus on surface preparation as much as the final coat: from filling cracks, sanding, stripping old wallpaper, sealing surfaces and ensuring everything is clean and dry before paint or wall covering is applied. We work with residential homes, commercial premises and heritage buildings, matching traditional techniques or modern finishes depending on the setting.

Our team handles interior walls and ceilings, woodwork (doors, windows, skirting), metalwork, external rendering, and trim with precision and care. We offer a wide palette of paints, stains, wallpapers and specialist finishes—whether smooth satin paints, textured effects, limewash or something more decorative. Safety, durability and aesthetic cohesion are always central. And we ensure minimal disruption throughout the process, protecting your existing fixtures and employing clean, efficient working practices.

With A1 Complete Builders, you’ll get painting and decorating that not only looks superb straightaway, but also stands the test of time, adding value, comfort and charm to your property.

Former Boat House - 2013

A former boat house Converted into a residential house a few years ago and has now had extensive work carried out with an internal steel frame fitted, all joinery supplied by Charlestown Joinery.

Internally finished to a very high spec with The Kitchen/Bathroom studio, Threemilestone, Porclin Plank bathroom tiles floor to ceiling, Kitchen fitted with high gloss units and finished off with Granite worktops. All internal doors fitted with solid oak.

Duration of time on site: 10 months

Four Bedroom Houses - 2008

Two stunning four bedroom houses built for a local developer  in Fraddon, both properties built to the same modern specification with en-suite bathrooms to master bedrooms, double glazing through out with a rear conservatory attached.
A1 Complete Builders undertook all works from excavations through to the full build.

Duration of time on site: 12 months

Contract price: £120,000 [each] in 2008/09 one sold for £245,000 and the other for £260,000

Three Bedroom House - 2011

A1 Complete Builders acquired this plot with planning permission to build a three Bedroom house.
A very modern build block construction with Brick coins, double glazing through out, solid fuel stove supplied by Wendron stoves. Also fitted with under floor heating through out driven by a modern air source heat pump.
Internal works finished to a high standard, hard wood doors, quality fitted Howdens kitchen complete with aisle.
A1 sold this property through our website before completion.
Duration of time on site: 7 months.

Basement Extension - 2013

Demolition of small utility room to make way for a modern part basement kitchen extension.

A stunning extension, designed by a local architect. Difficult access made this extension expensive when compared to other similar size extensions but the clients was delighted with the overall finish. A reinforced concrete retaining wall formed the external skin, holding back the ground part way up.

A modern build fitted out with Jeld Wenn Joinery windows etc and a mid range Howdens Kitchen.

Duration of time on site: 14 weeks

Antron Barn - 2012

A stone faced bedroom extension built in 2012 with one en-suite bedroom and a family bathroom.

This high quality extension with high sloping ceilings and ten solar powered Velux roof windows fitted was built on solid granite.

The stunning bathrooms were fitted with very high spec Sanctuary Ware and porcelain plank style tiles.

Duration of time on site: 5 months

Extension - 2011

A Stunning Steel Framed Kitchen Extension built in 2011 that shows off a unique vaulted ceiling with string lights and a full gloss fitted Kitchen.

A natural Slate roof and powder coated Bi Fold doors supplied by C.A.W.

Duration on site: 5 months.

Four Winds - 2011/12

This complex Project built in 2011/12 with various Extensions to include a Lounge Extension with a Balcony over, a Kitchen Extension, One timber Framed bedroom Extension and a Garden Room Extension. This property has five bedrooms, all with en-suits, bathrooms and sleeps ten people.

The whole interior was completely gutted and completely renewed and finished to a very high standard, complete with a double Garage and Patio area.

Duration on site: 11 months.

The Barn Cottage - 2010

A stunning Stone built Extension accommodating a large kitchen and two bedrooms built in 2010.

All materials sourced locally, Granite stones and Coins, natural slate roof complete with dormers and internally, all solid Oak floors and solid Oak doors fitted throughout.

Duration on site: 6 months

Extension - 2009

A traditionally built block extension accommodating a lounge and one bedroom built in 2009.

This two story Extension with locally sourced Granite Coins was finished to the highest of standards and matched in well with the existing property.

Extension - 2009

A traditional built block Extension accommodating a lounge and two bedrooms built in 2009.

A cut roof finished with two Dormers and a Tiled roof, U.P.V.C double glazed windows and U.P.V.C doors.

Duration on site: 3 months

Pit Lane - Extension, Fraddon - 2007

A Traditional built Block Extension accommodating a lounge and two bedrooms built in 2007.

Cement fibre roof and U.P.V.C window and doors.

Duration on site: 3 months.

Rev Tonkin's Daniel Road Extension - 2005

A unique industrial kitchen Extension built in 2005 for a local Baker complete with stainless steel work surfaces Bakers ovens and natural slate floors throughout.

The roof was fabricated in Zinc with impressive powder coated Bi Fold doors, supplied by C.A.W.

Duration on site: 4 months.

Ivy Cottage - 2004

A demolition of a single block Extension with an Asbestos roof to a new kitchen/bedroom Extension, cutting in a new Thatched roof to match the existing one built in 2004.

Duration on site: 5 months

Snooker/Bedroom Extension, Newton Abbot - 2002

A Solid Brick Extension built in 2002 to accommodate a large Snooker room/Bar on the ground floor and two double Bedrooms on the first floor.

A modern build with all local and modern materials used.

Duration on site: 4 months.

Office: 01726 883 388 (Mon-Fri 8am - 4.30pm) 
Mobile: 07979 934 678 (Call anytime)

Services

Extensions & Renovations
Lime and Cob Work
Demolition & Groundworks
Conservation & Restorations

Legal

Cookie Policy
Privacy Policy
Terms and Conditions

© Copyright A1 Complete Builders - All rights reserved | Website design by Edworthy Media and Technology Limited

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram