Flood damaged property in 2011. This project included a complete Refurbishment and Demolition of a damaged Extension caused by severe floods in 2010.
Twenty piled Foundations were drilled six meters in the ground to ensure the new Extensions stability.
Duration on site: 8 months
A Stunning Steel Framed Kitchen Extension built in 2011 that shows off a unique vaulted ceiling with string lights and a full gloss fitted Kitchen.
A natural Slate roof and powder coated Bi Fold doors supplied by C.A.W.
Duration on site: 5 months.
This complex Project built in 2011/12 with various Extensions to include a Lounge Extension with a Balcony over, a Kitchen Extension, One timber Framed bedroom Extension and a Garden Room Extension. This property has five bedrooms, all with en-suits, bathrooms and sleeps ten people.
The whole interior was completely gutted and completely renewed and finished to a very high standard, complete with a double Garage and Patio area.
Duration on site: 11 months.
A stunning Stone built Extension accommodating a large kitchen and two bedrooms built in 2010.
All materials sourced locally, Granite stones and Coins, natural slate roof complete with dormers and internally, all solid Oak floors and solid Oak doors fitted throughout.
Duration on site: 6 months
Dormer Roof Conversion - 2009
This 1950s Bungalow had huge scope in the loft and lent favourably towards a roof conversion. A1s job was to undertake the Structural work and build three Roof dormer conversions only as our client being a carpenter intended to finish the internal works himself.
Our team of experts cut through the cut roof and constructed three double dormers, front and rear. All mini roof tiling undertaken and all lead work, fitting of double glazed windows.
Duration of time on site: 6 weeks
A1 Complete Builders took this job on Near the end of completion after a local building company went bust!!
Our involvement in this project consisted of construction of various steps being built, plastered and coping stones laid, various areas that needed plastering, K Rend in places also decorating in most flats, ten in total.
Work on various balconies, lead work and correction of shoddy workmanship in various areas.
Also a complete construction of the car park area, kerb laying and tarmac finish.
This property was acquired by A1 Complete Builders as a one Bedroom house that had no planning for the sum of £73,000.00
Once purchased we applied for planning permission to convert into two flats, a one bed flat on first floor and a two bed flat on ground floor. [Permission was granted]
A Kitchen extension constructed on the first floor making flat one a one Bedroom flat also a Kitchen/Diner Extension on the ground floor making this a two bedroom flat.
Both Flats was put on the open market and sold. Flat one £105,00 and Flat two £125,000
Duration time on site: 6 months
A traditionally built block extension accommodating a lounge and one bedroom built in 2009.
This two story Extension with locally sourced Granite Coins was finished to the highest of standards and matched in well with the existing property.
A traditional built block Extension accommodating a lounge and two bedrooms built in 2009.
A cut roof finished with two Dormers and a Tiled roof, U.P.V.C double glazed windows and U.P.V.C doors.
Duration on site: 3 months
Driveway Block Paving - 2007/2009
A1 Complete Builders undertook extensive work at this property. See our extension section look for Releath Extensions. Also see our section on Barn Conversions - Releath Barn Conversion