A unique industrial kitchen Extension built in 2005 for a local Baker complete with stainless steel work surfaces Bakers ovens and natural slate floors throughout.
The roof was fabricated in Zinc with impressive powder coated Bi Fold doors, supplied by C.A.W.
Duration on site: 4 months.