We have been awarded a contract to convert a loft in to a en suite master bedroom to include two dormers. A steel frame to be fixed in place then fixing new floor joists and construction of the dormers. The usual insulation and internal finishes. Winder stairs supplied by D.J. Newman. All materials sourced locally. Plumbing by C.G plumbing & Heating and Electrics by York Electrics.
Duration of time on site: 12 weeks